TL;DR. In 90 days most seed SaaS teams can scope Common Criteria, assign control owners, stand up MFA and access reviews, collect a starter evidence pack, pick an auditor, and complete Type 1 fieldwork—if leadership treats readiness as a weekly operating rhythm, not a side quest.
Claim ladder Material statements on this page are labeled Verified, Inferred, or Unknown per editorial standards.
Owner: FounderDone when: letter signed and scope frozen · Engagement letter
Readiness self-check
Owner: Checklist leadDone when: control list walked end-to-end with owners
Respond to PBC lists
Owner: Checklist leadDone when: provided-by-client requests answered within agreed SLA
Close gaps; schedule report for procurement
Owner: FounderDone when: gaps closed before opinion date; delivery date shared with sales · Week-2 procurement
If you miss a week, slide the calendar—do not compress evidence into a heroic weekend. Auditors sample operating rhythm.
Print checklist squares
Use the empty squares below when printing. This page does not save checkbox state (no localStorage). Educational only — completing squares does not mean you are audit-ready.
Week 0 folder + owner named
Days 1–30 scope + MFA baseline
Days 31–60 evidence rhythm running
Days 61–90 auditor engaged / fieldwork
Get the checklist pack
The full 90-day Type 1 checklist plus the week-2 procurement packet as one print-ready document — the same text as the guides, gathered to print and work through. Enter your email and the pack opens on the next page: automated delivery, no account. Educational reference only — not bespoke advice, and ProofWindow is not GRC software.
Questions founders ask
Do we need a GRC tool in the first 90 days?
Not strictly. You need owners, evidence, and an auditor. Tools help when integrations save weekly hours. The checklists that work are owned in a weekly 30-minute meeting with named humans, and the 90 days run on named control owners, a weekly evidence pull, and auditor engagement, not on a platform purchase.
Who should own the checklist?
A single accountable lead (often a founder or Head of Eng) with named control owners. On this checklist the lead runs the weekly evidence pull, while each control area—identity, change, vendors, HR and awareness, incidents—has its own named human, and phase owners are named per item from Week 0 onward.
What if we miss day 90?
Extend honestly. Do not fabricate operating history. If you miss a week, slide the calendar—do not compress evidence into a heroic weekend, because auditors sample operating rhythm. Completing squares does not mean you are audit-ready, and progress is not stored, so an honest extension beats a fabricated finish.
Sources
Cost and timeline figures on this site are educational planning ranges, not quotes from AICPA, CSA, Shared Assessments, or any auditor.
practitioner ProofWindow educational planning ranges — ProofWindow Editorial — Internal: cost/timeline bands are editorial planning language, not a surveyed dataset. Label Unknown for hard dollars; never attribute invented figures to AICPA/CSA/SA.